Hi, just a quick ask really..
Noted for a while the Montrose Exchange (ESMON) was at 30-June-12 For enablement but has since changed to 30-Sep-12.. not that im surprised as this is 3rd date..
However on the infinity checker map says the exchange is done, also on openreach site where you can download pdf saying which exchanges are done.. so was after a bit of clarification as to what the actual date is.. as we were soo close to the 30th it hurts....
Solved! Go to Solution.
Yup, that was it... ahh cmon fix me cabnet dammit... one of the underground ones with a cover... they have been out n played with it.. not sure if any upgrade work was done, but new tarmac .... ghaad the paitence.. i have none
the cabinet is a green box in the street next to the existing green box not underground the fibre one will look like this
ok, so only fibre has green boxes, those with the underground boxes wont be upgraded yet... that what you mean... as not all phone lines have those cabinets.
so in essence if a green box hasnt appeared it aint done.. ??
Thanks all.... ill go sulk in the corner till its done then.... cmon dammit.....
woops double post