I am currently building a new house and as BT customer want to transfer my equipment and package over when complete in around 5 or 6 months. However I will need infinity connection adding. This runs along the side of my house along with gas , electricty etc all of which are being installed over the next 6 - 8 weeks so the area will be open and easy to acess. How can I arrange for a connection to be planned in for BT at the same time then I can have the cable in some ducting ready for when we are moving in, without physically ordering a TV/Broadband package? I could simply order a few weeks before we move in but it seems like a lot of extra work, the area covering the cables will then have been re-covered by concrete as its a right of way over my land.
are you talking about FTTP as against normal FTTC? are you in an FTTP area?