cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
828 Views
Message 1 of 2

New line

I am currently building a new house and as BT customer want to transfer my equipment and package over when complete in around 5 or 6 months. However I will need infinity connection adding. This runs along the side of my house along with gas , electricty etc all of which are being installed over the next 6 - 8 weeks so the area will be open and easy to acess. How can I arrange for a connection to be planned in for BT at the same time then I can have the cable in some ducting ready for when we are moving in, without physically ordering a TV/Broadband package? I could simply order a few weeks before we move in but it seems like a lot of extra work, the area covering the cables will then have been re-covered by concrete as its a right of way over my land.

0 Ratings
1 REPLY 1
822 Views
Message 2 of 2

Re: New line

are you talking about FTTP as against normal FTTC?  are you in an FTTP area?



If you like a post, or want to say thanks for a helpful answer, please click on the Ratings 'Thumbs up' on left hand side.
If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.
0 Ratings