cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Highlighted
Contributor
351 Views
Message 1 of 5

Village rollout - positive feedback

Go to solution

We are in the process of getting FTTP installed and a number of villagers are pleased with work so far with engineers running fibre cable to premises. Does anyone know where we can leave feedback for the engineers?

 

All positive and on time with switchs on starting from 12th September if all goes to plan...

0 Ratings
4 REPLIES 4
Highlighted
Distinguished Sage
347 Views
Message 2 of 5

Re: Village rollout - positive feedback

Go to solution
It is Openreach that do all the installs not BT
0 Ratings
Highlighted
Distinguished Sage
Distinguished Sage
338 Views
Message 3 of 5

Re: Village rollout - positive feedback

Go to solution
Highlighted
Aspiring Contributor
322 Views
Message 4 of 5

Re: Village rollout - positive feedback

Go to solution
Our village is co funding FTTP I can't wait. The waiting list is long however 😞
0 Ratings
Highlighted
Contributor
298 Views
Message 5 of 5

Re: Village rollout - positive feedback

Go to solution
Excellent many thanks for the link
0 Ratings