cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Arsie
Contributor
485 Views
Message 1 of 5

Village rollout - positive feedback

Go to solution

We are in the process of getting FTTP installed and a number of villagers are pleased with work so far with engineers running fibre cable to premises. Does anyone know where we can leave feedback for the engineers?

 

All positive and on time with switchs on starting from 12th September if all goes to plan...

0 Ratings
4 REPLIES 4
john46
Distinguished Sage
481 Views
Message 2 of 5

Re: Village rollout - positive feedback

Go to solution
It is Openreach that do all the installs not BT
0 Ratings
Keith_Beddoe
Distinguished Sage
Distinguished Sage
472 Views
Message 3 of 5

Re: Village rollout - positive feedback

Go to solution
mclarenrob2
Aspiring Contributor
456 Views
Message 4 of 5

Re: Village rollout - positive feedback

Go to solution
Our village is co funding FTTP I can't wait. The waiting list is long however 😞
0 Ratings
Arsie
Contributor
432 Views
Message 5 of 5

Re: Village rollout - positive feedback

Go to solution
Excellent many thanks for the link
0 Ratings