I need to find out whether a BT concrete covered inspection chamber in the ground can be relocated as is near to a wall that needs to be rebuilt. Please advise. Tony
Solved! Go to Solution.
Its nothing to do with BT, you need to contact Openreach.
Thank you 👍
Just to make you aware it's not going to be cheap.
What's the cost of resetting the chamber lid if I want to add dropped kerbs ?
As per message 2.
Depends on what type of Joint Box it is. If it’s a JMF then it’ll need to be rebuilt as a JBF so it can support the weight of a car driving over it.
Up to you to contact openreach and decide if you are proceeding with the chamber rebuild