Hi,
Have just returned to BT now that FTTP is available. Got my provisional engineer (external) visit date, and my go-live date, 24th Sept (today) and 5th Oct respectively.
On the 23rd Openreach engineer (lovely guy) popped over to inspect various bits and bobs and to discuss where the fibre would come into the house. Told me that different engineer would arrive to run the final bit of ducting from pavement through garden to house soon. All good.
I contacted current ISP to inform them of imminent departure based on go-live date. Current ISP cut-off ends 9 days after the fibre go-live.
This afternoon I get a notification BT: "We wont be able to install broadband on the date you wanted. Because of that we've arranged a new appointment for Oct 5." - which seems a little strange as that was the original date. Further inspection yields a bit of confusion tho:
5 Oct: Engineer visit for broadband. This is when our engineer will come to your home and install your broadband.
2 Nov (estimated): Engineer visit - outside your property
Chicken/Egg scenario? Am I going to have to extend current ISP term to cover until after 2 November? 😞
Give the FTTP team a ring, they should confirm dates with you. 0800 587 4787
the number posted by @pippincp is the number you need to contact for any FTTP queries/problems/orders. just need to persevere