I am about to get fttp installed (fibre pulled to door).
Currently on VDSL with BT.
How long is the downtime on install day?
Will my current VDSL connection be disconnected before fibre is up and running?
I had Full Fibre installed in February this year. Going from G.Fast it was around an hour for me to be fully installed etc.