I am moving home and also upgrading my current package for the new place. The engineer will be installing a junction box on the outside of the property and will run a fibre cable underground to that new box. The new cable will follow the same route as the existing cable.
The equipment won't arrive for another week after the engineer installs the new junction box and runs the new cable, then the second engineer visit is scheduled another 2 days later.
Does anyone else who has done this know, will I be without wifi until the second visit? Or can I use my existing BT router and the existing cable until then (and just receive a slower speed)?
Thanks