cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
2,100 Views
Message 1 of 4

Strange PPP messages/scenario

Viewing my event log this afternoon I spotted a rather odd restarting of the hub at 9am this morning. I thought it might have been the 14day router restart schedule but DSL uptime was about 8 days. Checked hub stats and log and all seems ok, never had it disconnect like this before but some interesting PPP logs. Worth noting that the broadband wasn't been used by any devices at the time and no one was in the property. SNR etc all same values post restart. Any ideas?

 

09:05:05 30 Aug. CWMP: HDM socket closed successfully.
09:05:05 30 Aug. CWMP: HTTP authentication success from pbthdm.x.x.x
09:05:05 30 Aug. CWMP: HDM socket opened successfully.
09:05:05 30 Aug. CWMP: session completed successfully
09:05:05 30 Aug. CWMP: HDM socket closed successfully.
09:05:05 30 Aug. CWMP: HTTP authentication success from pbthdm.x.x.x
09:05:04 30 Aug. CWMP: HDM socket opened successfully.
09:05:04 30 Aug. CWMP: HDM socket opened successfully.
09:05:04 30 Aug. CWMP: Server URL: https://pbthdm.x.x.x; Connecting as user: ACS username
09:05:04 30 Aug. CWMP: Session start now server: https://pbthdm.x.x.x Event code: 4 VALUE CHANGE
09:05:04 30 Aug. CWMP: Initializing transaction for event code 4 VALUE CHANGE
09:04:11 30 Aug. SIP WAN UP
09:04:09 30 Aug. NTP synchronization success
09:04:09 30 Aug. NTP Server: ntp.homehub.btopenworld.com
09:03:55 30 Aug. WAN Sensing Auto sensing Complete interface selected
09:03:55 30 Aug. WAN Sensing Auto sensing Running
09:03:54 30 Aug. WAN IPv6 Global unicast prefix / length: 2a00:23c4:8898:8a00::/56
09:03:54 30 Aug. WAN IPv6 Global unicast address allocated: 2a00:23c4:8898:8a00::1/64
09:03:54 30 Aug. WAN DHCPv6 events: BOUND
09:03:53 30 Aug. NTP synchronization start
09:03:53 30 Aug. WAN DHCPv6 events: INIT
09:03:53 30 Aug. WAN Sensing Auto sensing Complete interface selected
09:03:52 30 Aug. WAN Sensing Auto sensing Running
09:03:52 30 Aug. Success - secondary DNS servers
09:03:52 30 Aug. Success - primary DNS servers
09:03:52 30 Aug. WAN connection WAN2_INTERNET_PTM connected
09:03:52 30 Aug. PPP: IPCP up
09:03:52 30 Aug. PPP IPCP Receive Configuration ACK
09:03:52 30 Aug. PPP IPV6CP Receive Configuration ACK
09:03:52 30 Aug. PPP IPCP Send Configuration Request
09:03:52 30 Aug. PPP IPCP Receive Configuration NAK
09:03:52 30 Aug. PPP IPCP Send Configuration ACK
09:03:52 30 Aug. PPP IPCP Receive Configuration Request
09:03:52 30 Aug. PPP IPV6CP Send Configuration ACK
09:03:52 30 Aug. PPP IPV6CP Receive Configuration Request
09:03:51 30 Aug. PPP IPV6CP Send Configuration Request
09:03:51 30 Aug. PPP IPCP Send Configuration Request
09:03:51 30 Aug. PPP: CHAP authentication succeeded
09:03:51 30 Aug. PPP CHAP Receive success : authentication successful
09:03:51 30 Aug. PPP CHAP Receive Challenge
09:03:51 30 Aug. PPP: LCP up
09:03:51 30 Aug. PPP LCP Receive Configuration ACK
09:03:51 30 Aug. PPP LCP Send Configuration ACK
09:03:51 30 Aug. PPP LCP Receive Configuration Request
09:03:51 30 Aug. PPP LCP Send Configuration Request
09:03:51 30 Aug. PPP: Received PADS
09:03:51 30 Aug. PPP: Sending PADR
09:03:51 30 Aug. PPP: Received PADO
09:03:50 30 Aug. PPP: Sending PADI
09:03:45 30 Aug. PPP: Sending PADI
09:03:40 30 Aug. PPP: Sending PADI
09:03:35 30 Aug. PPP: Sending PADI
09:03:30 30 Aug. PPP: Sending PADI
09:03:27 30 Aug. DSL Link Up: Down Rate=54832kbps Up Rate=20000kbps; SNR Margin Down=6.2dB Up=9.5dB
09:03:25 30 Aug. PPP: Sending PADI
09:03:20 30 Aug. PPP: Starting PPP daemon
09:03:19 30 Aug. WAN Auto-sensing detected port DSL WAN
08:56:35 30 Aug. SIP WAN DOWN
08:56:31 30 Aug. SIP WAN DOWN
08:56:31 30 Aug. WAN Sensing Auto sensing Complete interface selected
08:56:31 30 Aug. WAN Sensing Auto sensing Running
08:56:29 30 Aug. WAN Sensing Auto sensing Complete interface selected
08:56:29 30 Aug. WAN Sensing Auto sensing Running
08:56:29 30 Aug. WAN connection WAN2_INTERNET_PTM disconnected.[ERROR_NO_CARRIER]
08:56:28 30 Aug. PPP: Stopped PPP daemon(0 1 5)
08:56:28 30 Aug. PPP LCP Send Termination Request (User request)
08:56:28 30 Aug. PPP: IPCP down
08:56:28 30 Aug. PPP: LCP down
08:56:28 30 Aug. DSL Link Down: duration was 754715 seconds

20200830_165503.jpg

0 Ratings
3 REPLIES 3
2,087 Views
Message 2 of 4

Re: Strange PPP messages/scenario

Firmware upgrade? There's nothing abnormal in the logs for anything else.

0 Ratings
2,078 Views
Message 3 of 4

Re: Strange PPP messages/scenario

Says last update was Sunday 19th July for latest firmware update. Unless it's been downloaded for a later installation date?

0 Ratings
2,058 Views
Message 4 of 4

Re: Strange PPP messages/scenario

Perhaps, but if it was a firmware update that wasn't successful you can force it with a factory reset using the pinhole button. Hold it in for about 20 sec until the lights flah.

0 Ratings